Training Grounds
The following are a listing of ground facility particulars, scope and procedures:
BURN BUILDING
- Reinforced concrete walls, floors and roof construction
- Floors sloped to exterior scuppers to drain water
- Design similar to “Cape Cod” style house
- Interior walls finished with special refractory cement tiles to ensure long, useful life.
- Interior partitions with functioning doors to facilitate multiple drill possibilities
- Steel shutters on windows to facilitate multiple drill possibilities
- Roof hatches for drills
TRAINING TOWER
- Reinforced concrete walls, floor and roof construction
- Exterior fire escape for drills
- Interior stair tower
- Floors sloped to exterior scuppers to drain water
- Internal sprinkler system for drills
- Steel shutters on windows to facilitate multiple drill possibilities
SITE UTILITIES
- 12″ Water service to site
- 5 fire hydrants
- Retention basin to collect all run off water
- Site lighting for night drills
SITE IMPROVEMENTS
- Fencing of entire site
- Paved areas for fire truck drills and parking
- Grassed areas and landscaping
- Concrete pad for SCBA maze
- 3 concrete pads for vehicle drills
- Drafting pit for drills
- Confined space training area